Installation preview
Generated from plant roof survey
Solar PV · 1,963 panels
72% roof utilisation
Grid
73.4%
4,548,553 kWh/yr
Solar
26.6%
1,651,447 kWh/yr
Storage
0%
0 kWh/yr
Investment outcome
Live as you change the configuration
System capacity
1,207.2 kWp
1,963 panels · 6,000 m² roof
Annual bill saving
RM 0.75 M
At RP4 45.62 sen/kWh
Capital cost
RM 3.14 M
Installed, incl. inverters
Payback period
4.2 yrs
↓ 1,252 tCO₂e/yr avoided
Choose infrastructure
☀
Solar PV
Rooftop generation to offset daytime production load.
AI recommended
▤
BESS
Battery storage for peak shaving and demand-charge control.
⚡
EV Charging
Schedule optimiser for forklift and logistics fleet.
Software only
Solar PV configuration
Drag to see payback update live
Usable roof area
Roof utilisation
Panel model
High-efficiency mono
Panel quantity1,963 panels
System capacity1,207.2 kWp
OrientationSouth-east
Tilt angle
Shading loss
Performance ratio
Malaysian data applied
Selangor irradiance 4.68 kWh/m²/day
TNB RP4 tariff
Solar ATAP rules
Grid factor 0.758 tCO₂/MWh
◷ Local irradiance, tariff blocks and grid emission factors are applied automatically — no manual lookup.